±´¶û¶Ù×ۺϲ¼Ïß
Open Office Solutions The office opened Feb. solution is for the Office of the large bays and frequent changes in the office layout.

TIA/EIA568B standards, the definition of assembly point, in such programs has been applied, as rallying point for the two horizontal cross-connect points, two

Horizontal respectively from the management of MDF leads to the trunk cables and connectors work area socket adapter cable. Set by 50 points or 100-110 to have legs

MDF, fixed in the wall; Or a broadband network chassis, or the contents 24 48 RJ45 modular patch panels. Require changes in the office layout, use

Households only to a short adapter cable layout.

 
Copyright(c) 2007 by Beild. All rights reserved